Abstract

This paper develops a short-term model for the optimal operation of hydropower reservoirs. The model incorporates Muskingum channel routing, flow ramping constraints attributable to navigation requirements, and constraints on turbine operating regions, up/down time, and startup number. Lagrange multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual unit subproblems, which are solved by the improved simplexlike method (SLM) and dynamic programming (DP). The Lagrange multipliers in the dual problem are updated by using an improved subgradient method, and the dual solution is modified to be feasible to the primal problem by using an efficient iterative policy. The method proposed has advantages in dealing with multiple identical units by defining united-generators to give a lower dimension and less execution time of the hydro subproblem. In a case study, the derived solution is very close to the optimal one, with a distance in benefit less than 0.55%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.