Abstract
The short-term oil production optimization of offshore platforms which use continuous gas lift and consider several operational constraints is a challenging task, specially when decision variables include both continuous and integer ones. The intrinsic non-linearity of the Gas Lift Performance Curves (GLPC) naturally yields to Mixer-Integer Nonlinear Program formulation. Picewise linear approximations of the GLPC are usually applied in order to reduce the complexity of the optimization problem and to ensure an approximate solution, leading to Mixer-Integer Linear Program formulation. However, a comprehensive and comparative study of these two formulations for the oil production optimization problem is scarce in the literature. This paper provides a deep performance evaluation of these two approaches, showing the limitations of both strategies, and proposes a hybrid two-stage optimization strategy to achieve the global optimal operating condition which maximizes the oil production subject to safety, environmental and processing capacity constraints.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.