Abstract
The paper develops a short-term hydrothermal scheduling algorithm based on the simulated annealing technique. In the algorithm, the power balance constraint, total water discharge constraint, reservoir volume limits and constraints on the operation limits of the hydrothermal generator and the thermal generator are fully accounted for. The relative operation capacities of the hydroplant and the thermal plant are also considered. A relaxation method for checking the limits is proposed and included in the algorithm. The performance of the algorithm is demonstrated through a test example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEE Proceedings - Generation, Transmission and Distribution
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.