Abstract

Due to the particularity of the site selection of hydropower stations, the canyon wind with large fluctuations often occurs during the construction of the hydropower station, which will seriously affect the safety of construction personnel. Especially in the early stage of the construction of the hydropower station, the historical data and information on the canyon wind are scarce. Short-term forecasting of canyon wind speed has become extremely important. The main innovation of this paper is to propose a time series prediction method based on transfer learning. This method can achieve short-term prediction when there are few wind speed sample data, and the model is relatively simple while ensuring the accuracy of prediction. Considering the temporal and nonlinear characteristics of canyon wind speed data, a hybrid transfer learning model based on a convolutional neural network (CNN) and gated recurrent neural network (GRU) is proposed to predict short-term canyon wind speed with fewer observation data. In this method, the time sliding window is used to extract time series from historical wind speed data and temperature data of adjacent cities as the input of the neural network. Next, CNN is used to extract the feature vector from the input, and the feature vector can form time series. Then, the GRU network is used for short-term wind speed prediction by the time series. Experimental results show that the proposed method improves MAE and RMSE by nearly 20%, which will provide new ideas for the application of wind speed forecasting in canyons under complex terrain. The research contents of this paper contribute to the actual construction of hydropower stations.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call