Abstract

Temporary bridges, needed during construction of Swedish hydroelectric power plants to carry heavy trucks are described; new method of analysis by Green’s matrix for such bridges with finite hanger spacing; design of shoes, expansion joints, hanger connections and saddles; performance results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call