Abstract

The aim of the paper is to describe the methods contained in the International Electrotechnical Commission (IEC) draft standard Calculation of short-circuit currents in DC auxiliary installations in power plants and substations, and to test them using the dynamic computer simulation. The test network is a 220-V DC auxiliary system in a power station fed by a static converter. The limits of application of the proposed standard are also discussed with particular reference to DC traction systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.