Abstract

This paper involves the study of a simulation based proactive decision support module for the shop-floor scheduling of the plastic processing section (PPS) at Bharti Telecom Limited, Gurgaon, India. The flow of material and information in this shop is highly complex as it involves multiple product parts, sequence dependent setup, molding machine specifications, mould restrictions etc. with a variety of scheduling and operational choices. The shop floor planning and scheduling decisions are being exercised manually and there is enough scope of using this simulation based tool to improve the shop-performance. In this work, efforts have been made to simulate the scheduling environment of this section. The performance of the shop depends on various parameters such as initial conditions of the machines, the load on the system, sequencing rule etc. Also the user requirements are so varied and situation dependent that it requires the use of simulation techniques to get a better schedule. Further, there are some findings based on the simulation experiments, which are in the process of implementation in the shop.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.