Abstract
We put forward a new specialty blasting method to solve drill-jamming based on stress concentration and stress wave theory. Drill-jamming accident of banji was successfully solved at the early 2006 through this method first: for this drill-jamming, study drilling tools and location of drill-jamming to find the weak position (Fig. 1); produce impact loading and form stress concentration (Fig. 3) at weak position by place well-designed explosive package at special position. Through many times controllable safe explosions and repeatedly impact loading, accurate fracture, separate sinker bar and the above parts from drill bit, this part raised up successfully (Fig. 7). The rest would be taken out after second reaming.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.