Abstract
This article analyzes the current situation in the heating circuit of the boiler room. Nowadays the Taiginsky enterprise proposes to modernize the heat supply system. For the first time, the dual circuit scheme is applied instead of a three circuit scheme. The scheme was developed instead of the existing boiler room scheme. There is also a description of the main equipment of the boiler. A hydraulic calculation was performed and a piezometric graph of the existing and proposed schemes was built. In addition, there is the heat calculation of fire-tube boiler and calculated technological losses during the transfer of heat energy to consumers. The calculation of the main technical and economic indicators is given in the economic part. The protection system of boiler units from mechanical and chemical influences is considered.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.