Abstract

Topology control (TC) is an effective tool for managing congestion, contingency events, and overload control. The majority of TC research has focused on line and transformer switching. Substation reconfiguration is an additional TC action, which consists of opening or closing breakers not in series with lines or transformers. Some reconfiguration actions can be simpler to implement than branch opening, seen as a less invasive action. This paper introduces two formulations that incorporate substation reconfiguration with branch opening in a unified TC framework. The first method starts from a topology with all candidate breakers open, and breaker closing is emulated and optimized using virtual transactions. The second method takes the opposite approach, starting from a fully closed topology and optimizing breaker openings. We provide a theoretical framework for both methods and formulate security-constrained shift factor MIP TC formulations that incorporate both breaker and branch switching. By maintaining the shift factor formulation, we take advantage of its compactness, especially in the context of contingency constraints, and by focusing on reconfiguring substations, we hope to provide system operators additional flexibility in their TC decision processes. Simulation results on a subarea of PJM illustrate the application of the two formulations to realistic systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.