During the construction of the ventilation shaft A of the Luzhou Line of Taipei Rapid Transit System (TRTS), the shield machine obliged to disassemble in grouted soils outside the shaft as the excavations in the shaft were still in progress. This paper describes the use of ground improvement followed by cement and chemical grouting as well as dewatering to both reduce the water ingress to acceptable volumes and the piezometric pressures in an alluvial silty sand layer during the shield disassembly task. In addition, the chamber sealing and bulkhead installation were designed to prevent the tunnels and shaft from any accident through which the tunnel would subsequently pass.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Tunnelling and Underground Space Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.