Abstract
ABSTRACTSeveral recent studies have shown that the number of Phase I samples required for a Phase II control chart with estimated parameters to perform properly may be prohibitively high. Looking for a more practical alternative, adjusting the control limits has been considered in the literature. We consider this problem for the classic Shewhart charts for process dispersion under normality and present an analytical method to determine the adjusted control limits. Furthermore, we examine the performance of the resulting chart at signaling increases in the process dispersion. The proposed adjustment ensures that a minimum in-control performance of the control chart is guaranteed with a specified probability. This performance is indicated in terms of the false alarm rate or, equivalently, the in-control average run length. We also discuss the tradeoff between the in-control and out-of-control performance. Since our adjustment is based on exact analytical derivations, the recently suggested bootstrap method is no longer necessary. A real-life example is provided in order to illustrate the proposed methodology.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.