Abstract
AbstractPrecast concrete structures have been widely applied in the construction industry worldwide. However, the current construction method for the reinforced concrete frame–shear wall structure (FSWS) is semi‐precast because the shear wall is commonly cast‐in‐place. This paper proposes a full precast FSWS and investigates three new vertical joints with different lap splices that can facilitate on‐site construction. Push‐off tests are conducted to investigate the shear performance on the aspect of cracking and failure patterns, the evolution of deformation, stiffness reduction, and energy dissipation. A finite element model with delicate consideration of the contact is developed and validated against experimental data. A further parametric study is conducted. This study shows that the lap splice with a more uniformly distributed reinforcement layout yields the crack distribution more uniformly and increases the ductility of the joints. The proposed three vertical joints exhibit an improvement in ductility compared to the monolithic one. Furthermore, the shear keys change the failure mechanism of the precast joints into the multi‐struts failure mechanism thus increasing the shear strength. The parametric study shows that the decreasing of the splice lap length could increase the shear capacity of the vertical joints but decreases the ductility. However, the ductility reduction depends on the variation of lap splices.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.