Abstract
In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process, the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project. Based on the example of a shallow tunneling project on Subway line 8, this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.