Abstract

Most bids of Dalian Metro are carried out with shallow tunneling method. However, for the section of Xianggong Street Station of Line 2, the geologic condition, which is mainly composed of strong-weathered rock, is so poor that it brings great difficulties in tunnel excavation. To solve the problem of stability of surrounding rock, numerical simulation and field monitoring are used to analysis the displacement field, stress field and plastic zone in every step of construction which use CRD method and also though the contrast of both consequence, The safety of the construction process has been studied and analyzed. The result not only has important guiding meaning after the construction of the tunnel, but also provides the reference for the design and construction of similar projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.