Abstract

In order to find the cause of the shaft crack appeared in a 600MW steam turbine generator, several measurements are taken. The shaft assembly consists of three parts: shrink-fitted coupling, shaft and key which are used to transfer torque between coupling and shaft. First, the natural frequency of the shaft system is calculated. The result shows that the vibration signal contains the frequency nears the second natural frequency of the steam turbine shaft system. Second, stress field near the damaged coupling and shaft is analyzed using finite element method. The torque under different operation condition is calculated before stress analysis and applied to the shaft assembly, then. And, local stress concentrations position calculated is proved to be coincident with the place crack initiation. Finally, the cause of the fault is analyzed: at least three causes have found to be having something to do with the crack fault.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.