This paper presents the results of a series of field experiments performed to study the development of shaft resistance on continuous flight auger piles installed in sand. The test piles were instrumented in order to separate the shaft and base resistance, and to allow the determination of the distribution of shaft resistance along the pile shaft. The tests highlighted the importance of accurate calculation of the shaft resistance for nondisplacement piles. At a typical maximum allowable pile head settlement of 25mm, more than 71% of the pile resistance was provided by shaft friction. Conventional methods of estimating shaft resistance were assessed. It was found that methods which incorporated parameters directly interpreted from in situ test results provided the most consistent estimates. In the final section, differences between the shaft resistances mobilized on displacement and nondisplacement piles are considered.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.