Abstract
Manufacturing processes are often disrupted by unexpected events, such as machine breakdowns, raw material shortages, and the arrival of new orders. Effectively managing these uncertainties is crucial for maintaining the feasibility and optimality of the production system. The efficiency of a manufacturing system is heavily dependent on the optimality of its scheduling plan. In this study, we present a reactive scheduling approach based on the S-graph framework. The proposed method is specifically designed to handle the arrival of new jobs and generate schedules with the shortest makespan, i.e., the minimum total completion time. Whenever a new order is received, the method dynamically adjusts the production plan through rescheduling. Three distinct scheduling policies are identified that determine which tasks require scheduling or rescheduling and which tasks should remain unchanged in their schedules. To evaluate the effectiveness of the algorithm, we solve several examples from the literature and analyze the results. The findings demonstrate the efficiency and efficacy of the proposed approach. The ability to accommodate new job arrivals and generate schedules with a minimized makespan highlights the practical relevance and benefits of the S-graph-based reactive scheduling method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.