Abstract

The SF Submarine Cable System relies on equalization of accumulated misalignment at regular intervals along the length of the system to achieve performance objectives. Transmission tests of the undersea system during installation are required to implement this equalization. This article describes the tests that are conducted and the computations used to select equalizer settings just before an equalizer is overboarded.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.