Abstract
In this study, pressurized electro-osmotic dewatering (PEOD) as a pretreatment process, instead of the conventional practice of adding bulking agents, for sewage sludge bio-drying was proposed. Initially, various parameters were optimized for obtaining dewatered sewage sludge (DSS), treated by an efficient, quick, and energy-saving PEOD process. The results show that the moisture content (MC) of sewage sludge could decrease from 83.41% to 60.0% within 7.5 min in the optimum conditions of the PEOD process. Subsequently, two DSS bio-drying tests were carried out to investigate the effects of inoculation. The highest temperature (68.1 °C) was obtained for T2 (inoculation), which was 3.6 °C higher than that for T1 (non- inoculation). The MC accumulative removal rate for T1 (41.49%) was slightly less than that for T2 (44.60%). Lastly, the volatile solid degradation dynamics model parameters were measured. The degradation rate constants (k) for T1 and T2 were 0.00501 and 0.00498, respectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.