Abstract
It is often assumed in most deterministic and stochastic inventory models that lead-time is a given parameter and the optimal operating policy is determined on the basis of this unrealistic assumption. However, the manufacturing lead-time is made up of several components (moving time, waiting time, setup time, lot size, and rework time) most of which should be treated as controllable variables. In this paper the effect of setup cost reduction is addressed in a stochastic continuous review inventory system with lead-time depending on lot size and setup time. An efficient iterative procedure is developed to determine the near optimal lot size, reorder point and setup time. Furthermore, a sensitivity analysis is carried out to assess the cost savings that can be realised by investing in setup.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.