Abstract

Subsurface conditions at the site of a large box culvert constructed beneath a deteriorating bridge consisted of highly compressible alluvial clay. Concerned with settlements estimated up to 50 cm, engineers considered completely removing and rebuilding the bridge structure. With estimated settlements still exceeding 10 cm, rammed aggregate piers were selected for installation beneath the box culvert to control differential settlement and prevent downdrag on the existing bridge pier foundations. Despite construction challenges including high water table, very soft soil conditions, and low clearance for machinery beneath the bridge structure, it was determined that the benefits of the box culvert and embankment (i.e. ease of future roadway expansion and continual service of the highway throughout construction) outweighted the cost of replacing the bridge structure. Approximately 250 rammed aggregate piers were installed in a grid pattern with lengths ranging from 2.3 m to 6.7 m depending on embankment fill heights. Performance was monitored with settlement plates and compared to predictions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.