Abstract

In order to solve the problem of differential settlement of pavement after the backfilling of urban underground comprehensive pipe corridors based on a pipe gallery project in Xiong’an New Area, the mechanical calculation model of the pipe gallery foundation pit backfilling process was simulated by ABAQUS, and the pavement settlement and the change of the pipe gallery model under different construction conditions were simulated and verified. The results show that many external environmental factors have an impact on pavement settlement, and methods such as increasing the compaction degree of backfill soil and the slope of the foundation pit, reducing the width of the pit floor, and controlling the vehicle load after work can avoid the pavement damage caused by uneven settlement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call