Abstract

Railroad technology permits a single train to move a large number of individual freight cars. However, cars which are not in dedicated unit train or intermodal service experience considerable delay due to the consolidation and breakup of trains. Rail operations thus involve a tradeoff between the economies of shipment consolidation, and the resulting delays. More direct and/or more frequent train connections will increase costs, but reduce transit times. This article quantifies the cost of providing a range of transit times for general carload traffic for several representative U.S. rail systems. It shows that significant reductions in transit time will require a large increase in the number of train connections and operating cost. Changes in labor contracts to reduce train crew cost will provide some incentive for higher service levels, but reductions in crew cost alone cannot be expected to dramatically improve the performance of the carload segment of the industry.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.