Abstract

Improvement factors in hazard rate and age for a sequential preventative maintenance (PM) policy are introduced. Two imperfect PM models are analyzed: (1) PM reduces the hazard rate while it increases with the number of PMs, and (2) PM reduces the age. The PM is done at intervals x/sub k/ (k=1,2, . . . , N) and is imperfect. The optimal policies to minimize the mean cost rates are discussed. The optimal PM sequences (x/sub k/) are computed for a Weibull distribution.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.