Abstract
In the process of electric vehicle marketization, the charging infrastructure, especially the planning and construction of fast charging stations, is extremely important. The construction of charging stations is limited by various social factors and should adapt to the development of the charging demand. Therefore, based on the background research that has considered the social factors and determined a certain number of candidate sites, this paper proposes a method that selects the optimal constructing plan of charging stations with the lowest social costs from the candidate construction plans. First, an optimization model for siting and sizing the charging stations is created and then, the optimal number and location of the charging stations in the unplanned areas and the optimal number and power of in-station charging facilities are obtained by solving the model. After that, two development trends of the charging demand are considered. In case the existing charging stations are not suitable for the changed charging demand, the charging station construction scale is expanded or downsized based on the sequential strategy of the charging station construction, which helps avoid the fund loss and resource waste.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.