Abstract

In this research, a flow shop scheduling problem in which setup, processing and removal times are separated, with the objective of minimizing makespan, is considered. A tabu search based heuristic is presented for solving the addressed problem. The proposed heuristic begins with the construction of artificial processing times for each operation; then a modified NEH algorithm is used to generate an initial solution, followed by a designed tabu search procedure applied for further improvement of the solution. The proposed heuristic, as well as the existing one, is evaluated in a large number of randomly generated problems. The results of the experimental investigations of the proposed heuristic algorithm and the existing heuristic in meeting the objective of makespan are also reported. It is found that the solution quality of the proposed tabu search heuristic is better than that of the existing heuristic, but for large size problems more computational efforts are needed; however, the CPU time is still acceptable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.