Abstract

A mixed-model assembly line enables the joint production of different models of a common base product in intermixed model sequence (lot size one). Previous approaches for the short-term planning task of model sequencing either aim at minimizing work overload (mixed-model sequencing and car sequencing) or leveling part usages (level scheduling). However, at many manufacturers parts are consolidated by a third party logistics provider, who stocks Just-in-Time delivered parts in a consignment warehouse adjacent to the line. The manufacturer issues a complete cargo carrier (e.g. a euro-pallet) whenever his own intermediate storage of parts is depleted. Thus, the manufacturer aims at a model sequence which minimizes his own inventory costs. This paper formalizes this novel model sequencing problem and describes different heuristic and exact procedures. Furthermore, the solutions yielded by these approaches are compared to the traditional level scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.