Abstract
We study the problem of sequencing mixed-model assembly lines operating with a heterogeneous workforce. The practical motivation for this study comes from the context of managing assembly lines in sheltered work centres for the disabled. We propose a general framework in which task execution times are both worker and model dependent. Within this framework, the problem is defined and mathematical mixed-integer models and heuristic procedures are proposed. These include a set of fast constructive heuristics, two local search procedures based on approximate measures using either a solution upper bound or the solution of a linear program and a GRASP metaheuristic. Computational tests with instances adapted from commonly used literature databases are used to validate the proposed approaches. These tests give insight on the quality of the different techniques, which prove to be very efficient both in terms of computational effort and solution quality when compared to other strategies such as a random sampling or the solution of the MIP models using a commercial solver.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.