Abstract

This paper investigates semi-online hierarchical scheduling problems on two identical machines, with the purpose of minimizing the [Formula: see text]-norm of the machines’ loads. We consider two semi-online versions with knowing the total processing time [Formula: see text] of all jobs, or knowing the total processing time [Formula: see text] of the jobs of hierarchy [Formula: see text] for [Formula: see text] in advance. For the two semi-online versions, the best possible online algorithms are designed with competitive ratios of [Formula: see text] and [Formula: see text], respectively, where [Formula: see text] is the maximum value of the function [Formula: see text] in [Formula: see text]. When [Formula: see text], our results cover the known results for minimizing the makespan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.