The 130-ft high embankment at Selset Reservoir has been successfully constructed of clay of low permeabilhy in an area of high rainfall by using closely spaced drainage blankets to reduce the high pore-water pressures set up. Sand drains have been used to accelerate the consolidation of zones of soft clay in the foundation. Extensive field observations of Dore-water Dressure. both in the fill and in the foundation, have been made as a control measure during construction. The estimates of pore pressure made at the design stage are reviewed in the light of the results. The rise in groundwater level downstream of the cut-off on impounding has also been recorded. The effect of the resulting uplift on the stability of the downstream slope and south abutment, and itsc ontrol by relief wells, are also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.