Abstract

Voltage sag is the most common and severe power quality problem in the recent times due to its detrimental effects on modern sensitive equipment. Generally, direct-on-line starting of the three-phase induction motor (IM) and various kinds of short circuit fault are directly responsible for this event. This study investigates the impacts of starting and stopping of two three-phase IMs on the load voltage profile. To be more critical, two three-phase short circuit faults and one unsymmetrical fault are also simulated in the same network at different instants of time. A simple control algorithm of a real power optimised dynamic voltage restorer (DVR) with a reduced power factor strategy is presented to protect the sensitive load from these types of detrimental events. A novel fuzzy-proportional–integral based self-tuned control methodology is implemented in the proposed work to compensate the loss in the DVR circuit as well as to regulate the load voltage and the direct current link voltage. The results show the effectiveness of the adopted control scheme in DVR application to mitigate the voltage sag.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.