Abstract

This article investigates the impacts of both the time‐lagged ensemble technique and the multi‐centre ensemble prediction system (EPS) on tropical cyclone (TC) track forecasts. Four EPSs from European Centre for Medium‐range Weather Forecasts (ECMWF), Japan Meteorological Agency (JMA), National Centers for Environmental Prediction (NCEP) and China Meteorological Administration (CMA) participating in the TIGGE project are considered, and 60 TCs in the western North Pacific from 2010 to 2012 are investigated. The time‐lagged ensemble uses single‐centre EPS (SCE) initialized at different times to increase ensemble members for specific forecast times. Both the means of selected EPS members (SEAV) method and the ensemble‐mean method are applied to the time‐lagged ensemble, respectively. Verification results show that the time‐lagged ensemble yields marginal changes in forecast position errors compared with its zero‐lag counterparts for all SCEs by applying the SEAV method. The mean forecast position errors by the ensemble‐mean method are greater when adding previous data compared with the SEAV method.A variety of multi‐centre EPSs (MCEs) composed of SEAV‐integrated SCEs are investigated. These MCEs, labelled according to their component SCEs, are EC&NCEP, EC&CMA, EC&JMA, EC&NCEP&CMA, EC&NCEP&JMA and EC&NCEP&CMA&JMA. The EC&NCEP MCE, for example, is a SEAV‐integrated combination of the ECMWF and NCEP ensemble TC forecast tracks. It is found that MCE track forecasts are more accurate than SCE track forecasts. EC&NCEP has the best performance among all MCEs. In addition, MCEs are compared with an equally weighted consensus of deterministic model forecasts (MCDs). The MCEs outperform their corresponding MCDs at 24 h. Sensitivity tests on the weights of component SCEs in SEAV‐derived MCEs are conducted. For lead times within 72 h, if the component SCEs in an MCE have comparable performances, the MCE with equal weights of SCEs will be more accurate than those of non‐equal weights of SCEs. Otherwise, non‐equal weights of SCEs are more suitable for MCEs. However, for lead times longer than 72 h, the above result is not convincing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call