Abstract

This work presents the variant technical solutions for transport of waste to the external landfill of the open pit Gacko. The construction of road has several purposes and should ensure the stabilization of the outer landfill in the zone with deposited quaternary sediments as well as the waste transport to the external landfill by the high-capacity trucks. The selection of a more favorable variant was made from the aspect of unit costs for the waste transport and from the aspect of the costs of variant solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.