Abstract

Several drainage channels are usually planned in the reclamation area in order to ensure the basic water surface ratio. It is necessary to conduct deep foundation treatment before the excavation of the river due to the high water content of hydraulic fill in reclamation area. Cement mixing pile method has been widely used in the treatment of river soft foundation as a method with mature construction technology, moderate overall cost and obvious treatment effect. Taking a river in a reclamation area as an example, it is recommended to adopt the cement mixing pile method to treat the soft foundation of the river after comparing the vacuum preloading method and cement mixing pile method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.