Abstract

Defining the pushbacks at the open pit is one of the most important planning activities. Designing the pushbacks is the first step in a long-term planning of production at the open pit where the production is planned. Despite the existence of a large number of software, used for different mathematical algorithms for optimization the open pits, a role of mining engineers is still a key one in development the mining plans. The work presents the results of conducted impact analysis of selection the optimum pushbacks on the project economy. Based on the results, the importance of correct selection of pushbacks can be concluded for achieving the basic goal of the mining operation - the Net Present Value Maximization (NPV).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.