Abstract

PT. ABC is a company that has been around for 32 years and has branches spread across all major cities in Indonesia. PT. ABC manufactures products for the needs of motorized vehicles. PT. ABC wants to build an integrated system starting from raw material requirements, quality control, production, distribution, logistics to marketing. Because the current ERP system cannot fulfill the business process needs optimally. The platform to be used is web-based using a web framework, namely Code Igniter, the database used is MariaDB. The system development method will use the agile method. The agile method also has many derivative variants so that PT. ABC must really choose the best method according to the culture and business process of PT. ABC, and all of the agile development methods the most popular are the Adaptive - Software - Development (A S D) development method and the Dynamic System Development Method (DSDM) The aim of academics applying the AHP technique can determine which agile method is very proper for make use of. And in assumption, PT. ABC will use Adaptive Software Development (ASD). By using the AHP quantitative method, it is expected to be able to determine which method is the most suitable for use for the conditions and circumstances of PT. ABC so that the method used for ERP development will be faster and much more effective. and by using the AHP method it was found that the most appropriate method for PT. ABC is a method of Adaptive Software Development (ASD) Agile Method Development at PT. A B C. From table XI Adaptive Software Development (ASD) by value 0.2806 compared to Dynamic System Development Method (DSDM) by value 0.0969

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call