Abstract

In this paper, we conduct an analytical comparison of three pull production control systems: Kanban, CONWIP and Base-stock in multi-stage production processes. First, we compare the three control systems in a multi-stage serial production process. Then, we compare them in multi-stage assembly production processes, and present guidelines that allow us to select the best system. As a result, we show which structural parameters decide the superiority of one control scheme to the others, and how they are related. A key for superiority is a configuration of parameters, such as processing times and number of cards employed in the system. We show that there is no general superiority amongst the analysed concepts. Finally, we verify the effect of variability on the system performance, and generalise the analytical results of deterministic cases by conducting numerical experiments.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call