Abstract

This study is focused on the problem of contractor selection for the implementation of a solar power plant project to produce electricity from sustainable sources for the needs of the company Voćar. The goal of this research is to select a construction contractor to install a solar power plant using sustainability criteria. With this power plant, the company Voćar can reduce its electricity costs and contribute to the production of sustainable energy. A total of three main sustainability criteria were used, in which six auxiliary criteria were symmetrically distributed. With these criteria, six suppliers were analyzed, and expert decision making was carried out with the application of the fuzzy–rough approach. To define the weights of the criteria, the SWARA method was utilized in this study. Based on the findings of this method, the most important criteria are the ecological criteria. Using the CRADIS method, the contractors were ranked, and the results show that contractor C6 has the best results and is the first choice for implementing this project. Choosing the best supplier increases the sustainability of project implementation and the realization of the expected effects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call