Abstract

An approach is proposed for selecting the most efficient updated (renovated) version of gas cooling system (GCS) based on concordance of energy and economic optimization results. This approach has been put into effect in optimizing the make-up and operation conditions of heat exchanging equipment in the course of its seasonal operation (efficiency criterion-energy cost) as well as in comparing GCS design versions with complete replacement of air cooling devices (ACD) and addition of new ACDs to the existing ones (efficiency criterion-life cycle cost). A general strategy is given for selecting the updated version of GCS of compressor stations (CS), and the characteristics of major Russian-and foreign-made ACDs are compared. An example of solution to problems of compressor stations of gas pipelines (diameter 1420 mm and operating pressure 7.45 MPa) lying under climatic conditions of the central zone of Russia is given.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call