Abstract

As a new sustainable building production mode, prefabricated building supply chains can realize energy saving, environmental protection and full cycle value maximization of building products. Prefabricated building supply chains often experience disruptions due to supply instability, transportation delay and force majeure, resulting in project delays and cost escalations and posing challenges to the sustainable development objectives of enterprises. Therefore, it is important and essential to study the strategy of enhancing the resiliency of prefabricated building supply chains, which has not been comprehensively explored in previous papers. This paper constructs decision-making models for supply chain cost resilience strategies under varying scenarios of supply disruptions, incorporating both redundant inventory and back-up supplier strategy. It considers the total cost and resilience of the supply chain as dual objective functions. Parameter-tuned non-dominated sorting genetic algorithm-П (NSGA-П) algorithms were used innovatively to solve the project case, and the impacts of the redundant inventory coefficient and back-up supplier supply price coefficient on the model result were analyzed. The results indicate that the supply chain with resilience construction has a superior capability to cope with disruption. The results show that when there is a mild supply disruption, the general contractor uses the capacity within the supply chain and chooses a redundant inventory strategy to restore resilience. In the event of moderate disruption, both the easy inventory strategy and back-up supplier strategy are selected to maintain supply chain stability. In the event of a severe disruption, only the back-up supplier strategy is selected to cover the losses and maintain the project schedule. In addition, the choice of resilience strategy is impacted by the inventory levels and component prices of back-up suppliers. It further verifies the effectiveness of the model and the impacts of uncertain parameters in the model on the results. This study contributes to enhancing the resilience management of the prefabricated building supply chain by the general contractor, thereby elevating the overall efficiency and competitiveness of the supply chain and furthering the sustainable development of prefabricated buildings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.