Abstract
It is difficult to identify economically feasible alternatives to reduce the duration of construction, as many important factors are present in any given construction project, such as increased construction costs and incentives and decreased delay liquidated damages. Most importantly, thousands of activities are interconnected in a complicated manner. This study proposes a method for analyzing the priority of activities for the reallocation of resources in order to reduce construction delay duration. The proposed method is composed of two steps: the prioritization of activities that can reduce construction duration and a reallocation of resources based upon that prioritization. First, in order to analyze priority, combinations of the lowest-cost activities for reducing per day are derived. Then, the importance of influence factors is analyzed, using the fuzzy analytic hierarchy process and fuzzy inference, and priority is derived based on the importance level. Next, the resources are reallocated based on the objective functions of maximizing the importance of the selected activities, reducing the duration, and minimizing the reducing cost. Decision-makers can compare between the reduction duration and available cost, and compare between results of the proposed method and the existing cost-slope method. Then, decision-makers can use the proposed method differently based on their own preferences toward economic and qualitative importance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.