Abstract

Green buildings are considered more efficient than traditional buildings due to the incorporated techniques and the multidisciplinary specializations required to comply with their specifications, in addition to the advanced commissioning, which undergoes before handing over the buildings to the owners to ensure requirements conformance. As a result, the appropriate selection of a project delivery system acts as the essential factor that affects the performance of the project. This research aims at building a system that helps to select the best method to implement green buildings. Through studying the recent research approaches in project delivery systems, the factors that affect the selection of the optimal implementation method for green buildings have been identified; expert interviews have been done to study and analyze the main influential factors that affect the selection of the best method for implementing green buildings. The results of interviews indicate that the main influential factors are as follows: The occurrence of economic crises in the country, availability of financial capacity for the contractor and the owner, the lack of previous experience in similar projects, hiring an incompetent contractor, differences between design drawings among all disciplines, and providing qualified contractors, subcontractors, suppliers and craftsmen with sufficient qualifications early in the project. Depending on these main factors, a software system is built to choose the best delivery system for green building projects. This research encourages future works to focus on the quality and performance of green buildings and lays out the foundation for academic researchers to explore new techniques for evaluating the project delivery systems as well as supporting the decision-makers to choose the best.

Highlights

  • Project delivery in green buildings is more complicated

  • Without a clear understanding of this concept, it is difficult for users of construction services to understand the value of the particular project delivery method for the success of the construction process, the mechanism by which projects are produced and completed, including how to select the contractor, the range of service delivered, the form of relationship with the owner, and how to pay the contractor

  • The responder asked to assess the importance by Likert scale in ascending order

Read more

Summary

Introduction

Project delivery in green buildings is more complicated. It requires early interdisciplinary coordination and complete commitment to the green goals by the project team members. CM Provides advice to the owners in pre-construction work (e.g., engagement with design work to ensure optimum performance in material selection, systems, building procedures, site management consultancy, costs, schedule, security, and construction processes) or manage and supervise the work of contractors, including contract management and procurement. This advice may be given during the project life or in some parts of the project [8]. 5-4 Occurrence of economic crises in the country during the implementation of project

Methodology
The disputes of subcontractors during the implementation period
Findings
Inaccuracy in costing before signing the contract
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.