Abstract
An analysis of the mining-geological and mining-technical conditions and morphology of the ore bodies of deposit A is carried out, on the basis of which the selection of technically applicable competitive development systems is performed. The choice of the optimal development system is carried out on the basis of the estimated “critical grade” of gold inthe ore. It has been established that at values less than the “critical content”, it is advisable to use a development system with sublevel drifts with ore breaking by wells and subsequent dry effervescent backfilling of the excavation space, and at values above this - horizontal layers with hardening backfilling.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.