Abstract

This article describes the procedures, standard parameters and control requirements to be performed in order to achieve EC verification of a Control-Command and Signalling On-board Subsystem. An analysis of issues related to the assessment of the on-board subsystem is presented in terms of the necessary checks that must be performed by a notified body and the issues of interoperability tests of the on-board ERTMS with track-side infrastructure. Providing railway interoperability is strictly related to the introduction of unified rules for the assessment and verification of the ETCS and GSM-R subsystems that are part of the European Rail Traffic Management System (ERTMS). The article describes procedures, standard parameters, requirements and necessary controls that must be implemented to carry out EC Verification of a Control-Command and Signalling On-board Subsystem. Reference is also made to the issues of ERTMS on-board compatibility tests with track-side infrastructure. Keywords: TSI, CCO, ERTMS, conformity assessment, interoperability

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.