Abstract
The authors report measurement data on seismic waves in bulk blasting at quarries by using new high-precise electronic and pyrotechnic blasting systems. It is proved that both systems are efficient, intensity of seismic waves is much lower in large-scale bulk blasting. The authors implemented numerical modeling of seismic wave propagation under a short-delay bulk blast at a quarry. Influence of the blast delay parameters and their precision on the maximum level of seismic vibrations has been studied, and their optimal ranges have been established.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.