Abstract

Results are presented of a full-scale study to assess the seismic stability of the spillway tunnels at the Kapchagai HPP in connection with an increase in the seismic rating of the site. Tests of the concrete used in the tunnel lining and of the surrounding rock determined the physical and mechanical properties of the materials and calculations were carried out for an earthquake load of intensity 8 on the facility. Calculations were carried out using the Tunnel' program package (developed by the authors) and ANSYS program package. Zones were identified in the tunnel lining where hazardous tensile stresses may potentially occur. It is shown that the existing spillway tunnels are seismically stable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.