Abstract

The Yanghuya tailings dam, which is located in the city of Zibo, China, exposes the residential area below the dam to a high level of flood debris risk, and, as such, the stability of the tailings dam was evaluated. The seismic stability of the tailings dam was evaluated using pseudo-static and time-response approaches in the program FLAC, as the site is located in seismic intensity zone VII. The pseudo-static factor of safety (FOS) of the dam indicates that the FOS of tailings dam is above 1.13, which is within the permissible limits of the China National Standard Safety Code, which requires that the FOS must be above 1.05. A dynamic time-response analysis indicates that slides or large displacements may occur in the embankment fill along the interface between the silty clay and the bedrock. The sensitivity of these displacements to the damping ratio and the shear strength was evaluated. Improvements to the monitoring program are also proposed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.