Abstract
In this study, shear damage development of four precast bridge columns with different connection design details are first examined via quasi-static test. The short columns are of identical dimension and reinforcement arrangement for both pier and footing segments, and the span-to-depth ratio is 0.85 for shear study. The connection utilizes grouted splice sleeve (GSS) couplers for all four specimens. Different bonding materials are compared, effectiveness of shear keys is investigated, and variation of steel rebar grades is carried out. It is found that epoxy retain lower bond strength than high strength mortar, lower grade of longitudinal rebar significantly reduces shear strength of bridge column, and shear keys are of limited effectiveness on the overall shear damage development. An analytical method for shear strength calculation is then proposed and calibrated based on different test results, which incorporates possible influencing factors for shear strength estimation. Maximum difference between the test results and estimated strength values are less than 10%, and it indicates that the proposed method can be used as a reference for shear strength estimation of short precast bridge columns for seismic strength estimation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.