Abstract
Seismic Margin Assessment (SMA) is one of the methods for seismic safety assessment of nuclear power plants. The United States in the 1990s requires all running nuclear power plants to carry out an Individual Plant Examination of External Events (IPEEE), in the completion of the IPEEE of 110 units, 65 units using the seismic margin assessment method. The commercial nuclear power industry of China started late, although the Shanghai Nuclear Engineering Research and Design Institute in the 1980s to carry out seismic safety evaluation of relevant research. After the Fukushima nuclear accident, the National Nuclear Safety Administration requires all nuclear power plants in operation to carry out Seismic Margin Assessment. In view of the above background, the Shanghai Nuclear Engineering Research and Design Institute and Qinshan Nuclear Power Co., Ltd. on the Qinshan nuclear power plant to carry out the seismic margin assessment. Through the assessment, some weak links were found in the Qinshan nuclear power plant in some aspects. The Qinshan nuclear power plant in the implementation of the targeted improvements, the power plant’s seismic capacity has been effectively improved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.